Yanbu Export Refinery Redundant Supply Line Shoring Works Package
Yanbu Export Refinery Redundant Supply Line Shoring Works Package
Micropiles and pre-stressed ground anchors
Excavation Depth (ft.) | 56 |
The Skyscraper (United Tower) Shoring Works Package
The Skyscraper (United Tower) Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level
Excavation Depth (ft.) | 35 |
Perimeter (ft) | 560 |
SADARA Water Rub-Off Basin 3
SADARA Water Run-off Basin 3
Micropile & Base Slab Design of run-off basin
Riyadh Metro, Line 4, Elevated Station 4B1
Riyadh Metro, Line 4, Elevated Station 4B1
Geotechnical design for shoring and excavation system
PEC Regional Office Building Shoring Works Package
PEC Regional Office Building Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels
Excavation Depth (ft.) | 40 |
Perimeter (ft) | 560 |
Pace Tower Shoring Works Package
Pace Tower Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24" dia soldier piles and three (3) rows of pre-stressed ground anchors
Excavation Depth (ft.) | 60 |
Perimeter (ft) | 770 |
Pace Circle Shoring Works Package
Pace Circle Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24" dia soldier piles and three (3) rows of pre-stressed ground anchors
Excavation Depth (ft.) | 52 |
Perimeter (ft) | 1750 |
National College of Arts, Graduate Block, Shoring Works Package
National College of Arts, Graduate Block, Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels
Excavation Depth (ft.) | 35 |
Perimeter (ft) | 638 |
Naqi Mall Shoring Works Package
Naqi Mall Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels
Excavation Depth (ft.) | 40 |
Perimeter (ft) | 1050 |
MS Tower Shoring Works Package
MS Tower Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level
Excavation Depth (ft.) | 25 |
Perimeter (ft) | 390 |
Mint Properties Shoring Works Package
Mint Properties Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level
Excavation Depth (ft.) | 25 |
Perimeter (ft) | 560 |
Mabarak Center Shoring Works Package
Mabarak Center Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24" dia soldier piles and three (3) rows of pre-stressed ground anchors
Excavation Depth (ft.) | 60 |
Perimeter (ft) | 2716 |
King Faisal Hospital Service Tunnel Shoring System
King Faisal Hospital Service Tunnel Shoring System
Soil nail wall and ground anchors
Excavation Depth (ft.) | 56 |
Indigo Apartments Shoring Works Package
Indigo Apartments Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level
Excavation Depth (ft.) | 25 |
Perimeter (ft) | 560 |
Gulmohar Manzil Shoring Works Package
Gulmohar Manzil Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness
Excavation Depth (ft.) | 37 |
Perimeter (ft) | 560 |
Gulberg Hotel Shoring Works Package
Gulberg Hotel Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level
Excavation Depth (ft.) | 35 |
Perimeter (ft) | 390 |
Golf View Rumanza Shoring Works Package
Golf View Rumanza Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level and two levels of pre-stressed ground anchors
Excavation Depth (ft.) | 40 |
Perimeter (ft) | 410 |
Shoring Works for Extension of Amiri Dewan, Doha, Qatar
Shoring Works for Extension of Amiri Dewan, Doha, Qatar
Design Review of Shoring System
Our extensive resume is comprised of over 3,500 projects completed
Our diverse project list includes engineering buildings and manufacturing structures
Yanbu Export Refinery Redundant Supply Line Shoring Works Package
Yanbu Export Refinery Redundant Supply Line Shoring Works Package
Micropiles and pre-stressed ground anchors
Excavation Depth (ft.) | 56 |
The Skyscraper (United Tower) Shoring Works Package
The Skyscraper (United Tower) Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level
Excavation Depth (ft.) | 35 |
Perimeter (ft) | 560 |
SADARA Water Rub-Off Basin 3
SADARA Water Run-off Basin 3
Micropile & Base Slab Design of run-off basin
Riyadh Metro, Line 4, Elevated Station 4B1
Riyadh Metro, Line 4, Elevated Station 4B1
Geotechnical design for shoring and excavation system
PEC Regional Office Building Shoring Works Package
PEC Regional Office Building Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels
Excavation Depth (ft.) | 40 |
Perimeter (ft) | 560 |
Pace Tower Shoring Works Package
Pace Tower Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24" dia soldier piles and three (3) rows of pre-stressed ground anchors
Excavation Depth (ft.) | 60 |
Perimeter (ft) | 770 |