Yanbu Export Refinery Redundant Supply Line Shoring Works Package
Yanbu Export Refinery Redundant Supply Line Shoring Works Package Micropiles and pre-stressed ground anchors Excavation Depth (ft.) 56
Yanbu Export Refinery Redundant Supply Line Shoring Works Package Micropiles and pre-stressed ground anchors Excavation Depth (ft.) 56
The Skyscraper (United Tower) Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level Excavation Depth (ft.) 35 Perimeter (ft) 560
SADARA Water Run-off Basin 3 Micropile & Base Slab Design of run-off basin
Riyadh Metro, Line 4, Elevated Station 4B1 Geotechnical design for shoring and excavation system
PEC Regional Office Building Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels Excavation Depth (ft.) 40 Perimeter (ft)
Pace Tower Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24″ dia soldier piles and three (3) rows of pre-stressed ground anchors Excavation Depth (ft.) 60 Perimeter (ft) 770
Pace Circle Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24″ dia soldier piles and three (3) rows of pre-stressed ground anchors Excavation Depth (ft.) 52 Perimeter (ft) 1750
National College of Arts, Graduate Block, Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels Excavation Depth (ft.) 35
Naqi Mall Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels Excavation Depth (ft.) 40 Perimeter (ft) 1050
MS Tower Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level Excavation Depth (ft.) 25 Perimeter (ft) 390