The Skyscraper (United Tower) Shoring Works Package

The Skyscraper (United Tower) Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level Excavation Depth (ft.) 35 Perimeter (ft) 560

Read More

PEC Regional Office Building Shoring Works Package

PEC Regional Office Building Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels Excavation Depth (ft.) 40 Perimeter (ft)

Read More

Pace Tower Shoring Works Package

Pace Tower Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24″ dia soldier piles and three (3) rows of pre-stressed ground anchors Excavation Depth (ft.) 60 Perimeter (ft) 770

Read More

Pace Circle Shoring Works Package

Pace Circle Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24″ dia soldier piles and three (3) rows of pre-stressed ground anchors Excavation Depth (ft.) 52 Perimeter (ft) 1750

Read More

Naqi Mall Shoring Works Package

Naqi Mall Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels Excavation Depth (ft.) 40 Perimeter (ft) 1050  

Read More

MS Tower Shoring Works Package

MS Tower Shoring Works Package Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level Excavation Depth (ft.) 25 Perimeter (ft) 390

Read More