Mabarak Center Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24″ dia soldier piles and three (3) rows of pre-stressed ground anchors
Excavation Depth (ft.) | 60 |
Perimeter (ft) | 2716 |
Mabarak Center Shoring Works Package
Earth retention (shoring) system comprising of bored cast in situ 24″ dia soldier piles and three (3) rows of pre-stressed ground anchors
Excavation Depth (ft.) | 60 |
Perimeter (ft) | 2716 |