Ali Trade Center Shoring Works Package
Excavation Depth (ft.)
59
Site Perimeter (ft)
655
Services
Geo Technical Design
Earth retention (Earth retention (shoring) system comprising of bored cast in situ 24" dia soldier piles and three (3) rows of pre-stressed ground anchors) system comprising of bored cast in situ 24” dia soldier piles supported laterally by two levels of steel struts of varying dia and thickness at capping beam and waler beam levels