The Skyscraper (United Tower) Shoring Works Package
Shoring System Adopted
Soldier Piles with multi-level Steel Struts
Excavation Depth (ft.)
35
Site Perimeter (ft.)
560
Services
Geo Technical Design
Earth retention (shoring) system comprising of bored cast in situ comprising of 24” dia soldier piles supported laterally by steel struts of varying dia and thickness at capping beam level